(All dimensions
are shown in inches for convenience.) |
To
Build:Main
construction is from 2" x 4" lumber.The
5/16" lag bolts are
between 3" and 4" long with 1/4" pilot holes.The
forward lag boltsare
NOT screwed in flush, but are onlyscrewed
in until anchored firmly.The
bolt then acts as a post for the conduit pipes to slide over.The
lagbolts shown on the ends (almost screwed
in flush) are used to attach bracing chainsand
cables to the Tarzan Swing to give it rigidity.Make
2 of these baseboards. Click here
to return to How to Build.
|
|